Skip to content

We need UI overhaul this platform - #33

Open
ayyshim wants to merge 10 commits into
mainfrom
canopy/we-need-ui-overhaul-this-platform
Open

ayyshim wants to merge 10 commits into
mainfrom
canopy/we-need-ui-overhaul-this-platform

Conversation

@ayyshim

@ayyshim ayyshim commented Nov 22, 2026

Copy link
Copy Markdown
Owner

Handover: UI overhaul (G-35)

In short: you dropped this goal partway through (G-36, decision N-83), so nothing here is approved or finished. What was made is kept on the goal branch, and two private artifacts exist. Only design files were added. No app code changed.

1. What you asked for

  • Dana scans the current design and lists what's missing, so that someone who doesn't code can find their way around.
  • Dana redesigns everything and publishes two Claude artifacts: first a canvas design, then a working prototype. You get both links.
  • Both designs work well on phones and tablets as well as desktops.

2. What happened

The work went to the wrong people at first

My first plan used design skill labels that didn't match Dana, so all four tasks went to the developers. You asked for the work to go back to Dana (T-238), and I gave her four new tasks (T-239 to T-242).

I couldn't cancel the old tasks. Each one was marked done before my stop message arrived, and each time that started the next one:

Task Who What happened
T-234 Audit Tommy Finished before the move to Dana.
T-235 Canvas Trevor Finished and published. You turned it down.
T-236 Prototype Tony Finished and published. You dropped it in review.
T-237 Check Tina Closed with no work.

Then the goal was dropped

You dropped G-35 in G-36 (decision N-83). By then Dana had finished her audit (T-239) and one more version of the canvas (T-240). She then closed T-241 (prototype) and T-242 (check) without doing any work.

What exists now

Two private artifacts, neither approved:

  • Canvas design (31 boards, version 8): https://claude.ai/artifact/6JxuH4mXkoDvJSiiznwjP5
    Trevor made the first 29 boards. Dana added two "parts" boards and made a few changes:
    • The setup step leads with a "Download for Mac, Windows or Linux" button.
    • The board's mini map is now drawn.
    • The side sheet is fuller.
  • Clickable prototype (Tony's): https://claude.ai/artifact/LQw2vsT5TitggosEoY5wv9
    • Correction: N-83 and the G-36 handover say no prototype artifact was published. That's wrong. I checked the artifact list, and it is there.

On the goal branch canopy/we-need-ui-overhaul-this-platform:

  • Size: 10 commits and 84 new files, all in docs/design/ui-overhaul/, about 5.2 MB. The screenshots are 4.8 MB of that.
  • What's in it:
    • audit.md: Tommy's audit, with about 50 findings. His submit note says 33, which is wrong. The file itself gives no count.
    • audit-walkthrough.md: Dana's audit. It agrees with Tommy's and adds a step-by-step walk through the main jobs. The two were not merged into one.
    • shots/: 44 screenshots of the current app at desktop, tablet and phone widths.
    • canvas/: the source of the canvas artifact (version 8).
    • prototype/: the source of Tony's prototype.
  • Unchanged: no app code (frontend/, hub/) and nothing on main.

What the audits found (the gaps most likely to stop someone who doesn't code):

  • There's no home screen that shows what needs you.
  • On a tablet, the top bar runs off the screen, so Outputs, Give a goal and the menu can't be reached.
  • Approve is buried under "Spending limit" and "Checks" in the goal panel.
  • One settings menu mixes the organization, the workspace and the hub.
  • Most top bar buttons are icons with no labels.
  • Developer words are on the main path: token, branch, handover, session, directories.
  • Notes have no button of their own.
  • On phones, the board opens cropped and most of its buttons are too small to tap.
  • Faint text is too pale to read easily. It fails the accessibility contrast check.

3. How to check it

  1. Open the canvas: https://claude.ai/artifact/6JxuH4mXkoDvJSiiznwjP5
  2. Open the prototype: https://claude.ai/artifact/LQw2vsT5TitggosEoY5wv9
    • Try it at phone width as well, for example by narrowing the browser window.
  3. Read docs/design/ui-overhaul/audit.md, starting with "The short version" near the top. Then read audit-walkthrough.md.
  4. To see that only design files changed, run:
    git diff --stat main...canopy/we-need-ui-overhaul-this-platform
    Every line should be under docs/design/ui-overhaul/.

4. What isn't done, and the risks

  • Nothing is approved. You never signed off the canvas.
  • The prototype doesn't follow the newest canvas. Tony built it from Trevor's older canvas, before Dana's changes. For example, it doesn't have the download-first setup step.
  • Dana's own prototype (T-241) and the check (T-242) were never done. The second artifact is a developer's work. No designer has checked it for phone and tablet use.
  • The canvas isn't fully Dana's own design. You decided she should make her own and use Trevor's only for reference. Instead, she built on his boards, at the same link.
  • Some checks were partial:
    • Tony didn't re-check tap sizes after his last fixes.
    • Dana only skimmed the dark theme and the phone sheets of the canvas.
    • Nobody looked through the published boards inside the canvas artifact itself. They were only checked from the local files.
  • The audits leave things out:
    • Dark mode.
    • Live questions from agents.
    • Most hub admin screens.
    • In Dana's walk, the task panel, member chat and notes panel weren't captured cleanly.
  • Approving this handover may open a pull request. The "auto PR" setting is on by default. If it's on here, approving pushes the goal branch and opens a pull request with 5.2 MB of design files. Don't merge it unless you want those files in main.
  • Old branches are left over. Besides the goal branch, 11 canopy/we-need-ui-overhaul-this-platform--… branches exist. Some hold partial copies of this work, and some are empty. N-83 lists the main ones.

5. What you need to decide

  1. Leave it dropped, or pick it up again?
    • If you pick it up, my suggestion: start a new goal for Dana that begins from the audit and the version 8 canvas. She would get your approval on the canvas first, then build her own prototype and do the phone and tablet check.
  2. What to do with the files.
    • Keep them on the branch only. My suggestion: this keeps main clean and the work easy to find.
    • Or merge them into main as a reference. That adds 5.2 MB, mostly screenshots.
  3. Keep or delete the two artifacts and the old branches.
    • My suggestion: keep the artifacts, since they're private, and delete the old --… branches. Deleting can't be undone, so I'll only do it if you say so.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant